Overview
Drawing on involvement in RFPs, deployment, and operations across some 30 domestic HPC/AI infrastructure projects, this paper lays out the five most recurring design and operations pitfalls alongside measurable criteria. For each pitfall, it provides checklist items and verification benchmarks that can head off the problem at the RFP stage.