Skip to main content
Optiscale
Log inContact us
Solutions
HPC Cluster Design · CPU supercomputersAI Supercomputer · GPU training & inference clustersParallel Storage · Spectrum Scale · Lustre · BeeGFS · VASTInterconnect · InfiniBand · RoCE fabricsSchedulers · Slurm · KubernetesApplication Workload · Reference diagrams by workloadSizing Calculator · 5-minute sizing + 5-year TCO
Products
Luxe Vision · Unified monitoring across heterogeneous resourcesLuxe Ray · Heterogeneous resource operations & unified controlLuxe Vantage · Usage & billing built on the AI/HPC schedulerLuxe Orbit · Heterogeneous software provisioning & parallel managementLuxe Series Overview · The unified 4-layer storyRequest a Live Demo · Vision · Ray · VantageRequest a Closed PoC · Orbit — 1:1 environment setup
Services
Architecture Consulting · Workload definition → specification designImplementation & PM · Vendor integration & project managementPerformance Tuning · Architecture & configuration optimization plus code-level performance gainsManaged Operations · Multi-year operations contracts
Resources
TCO Calculator · On-premises vs. the three major cloudsSelf-Check · 8-question workload assessmentApplication Workload Library · 6 workload diagramsWhite Papers · In-depth technical white papersBlog · Tech Notes · Engineering blogNewsletter · Biweekly infrastructure updates
00Newsletter

Biweekly infrastructure updates, from operators to operators.

Published biweekly for HPC/AI infrastructure operators. New white papers, webinar schedule, and blog highlights, plus one case study. No ads, one-click unsubscribe. No spam.

01SUBSCRIBE

Subscribe

Just one line: your email. Published biweekly. No ads or tracking pixels. The first issue arrives the moment you sign up. Subscriber data is stored in compliance with GDPR/PIPA.

By subscribing you agree to our Privacy Policy.

02RECENT ISSUES

Recent issues

NCCL AllReduce and the Pitfalls of Rail-Optimized Topology

Spine-leaf vs rail-optimized — a measured 14% throughput gap on 8-GPU nodes.

GPU Utilization 30% → 78% — A 4-Month Project Retrospective

Queue policy + Luxe Vision monitoring + per-department usage visibility, applied together.

Writing an RFP in 30 Days — The Weighting Trap

Why equal weights like 25% price / 25% performance always end up wrong.

※ The full archive of past issues is included in the welcome email you receive right after subscribing.

Newsletter — Biweekly Infrastructure Updates | Optiscale